01 · Design freeze
Load unit, peak profile, interface list and exception catalog locked with named reviewers from operations and OT.
Dematic focuses on equipment-led WMS, WCS and warehouse control integration. The team documents who owns each handshake, alarm and recovery path so capital procurement, OT and maintenance evaluate the same boundary.
Ambiguous interface ownership is one of the most common reasons warehouse automation projects miss peak windows. Dematic records command direction, confirmation timeout, retry policy and human escalation for each layer before FAT scripts are frozen.
| Layer | Owns | Escalates when |
|---|---|---|
| WMS | Inventory authority, order release priority, allocation rules | Host cannot confirm inventory or wave release within agreed timeout |
| WCS / WES | Material-flow orchestration, buffer release, divert decisions | Downstream equipment rejects or accumulation exceeds design level |
| PLC | Local motion, interlocks, safe-stop and device-level diagnostics | Safety circuit opens or device heartbeat is lost |
| Fleet / FMS | AGV/AMR routing, charging policy, traffic arbitration | Blocked path or battery policy prevents meeting dispatch SLA |
Load unit, peak profile, interface list and exception catalog locked with named reviewers from operations and OT.
Command/response pairs, alarm ownership and recovery states exercised on the agreed equipment and software build.
Installed geometry, live loads and cutover windows validated; spares and diagnostics access recorded for service.
Dematic does not treat service as an afterthought slogan. Coverage describes response objectives, remote diagnostic rights, critical spare staging and the maintenance access reserved in the mechanical layout. Country and site coverage are confirmed per contract rather than implied by marketing maps.
Every rate claim carries SKU, order and peak-window assumptions in the project record.
See checklist →Interface cases reference the responsibility matrix rather than unnamed software demos.
Service path →Acceptance includes installed constraints, live loads and named exception scripts.
SAT path →Diagnostics, spares and recovery procedures remain visible after cutover.