Engineering accountability

About Dematic: ownership matrices before automation promises

Dematic focuses on equipment-led WMS, WCS and warehouse control integration. The team documents who owns each handshake, alarm and recovery path so capital procurement, OT and maintenance evaluate the same boundary.

Dematic engineering team reviewing responsibility matrix
Responsibility matrix

Clear owners across WMS, WCS, WES, PLC and fleet layers

Ambiguous interface ownership is one of the most common reasons warehouse automation projects miss peak windows. Dematic records command direction, confirmation timeout, retry policy and human escalation for each layer before FAT scripts are frozen.

LayerOwnsEscalates when
WMSInventory authority, order release priority, allocation rulesHost cannot confirm inventory or wave release within agreed timeout
WCS / WESMaterial-flow orchestration, buffer release, divert decisionsDownstream equipment rejects or accumulation exceeds design level
PLCLocal motion, interlocks, safe-stop and device-level diagnosticsSafety circuit opens or device heartbeat is lost
Fleet / FMSAGV/AMR routing, charging policy, traffic arbitrationBlocked path or battery policy prevents meeting dispatch SLA
Commissioning path

From factory evidence to site acceptance without guessing

01 · Design freeze

Load unit, peak profile, interface list and exception catalog locked with named reviewers from operations and OT.

02 · FAT scripts

Command/response pairs, alarm ownership and recovery states exercised on the agreed equipment and software build.

03 · SAT & handover

Installed geometry, live loads and cutover windows validated; spares and diagnostics access recorded for service.

Service coverage

Application, integration and documentation support by project scope

Dematic does not treat service as an afterthought slogan. Coverage describes response objectives, remote diagnostic rights, critical spare staging and the maintenance access reserved in the mechanical layout. Country and site coverage are confirmed per contract rather than implied by marketing maps.

  • Remote diagnostics boundaries agreed before go-live
  • Critical spares linked to mean recovery assumptions
  • Training artifacts tied to the accepted control states
Maintenance access lane beside automated storage
Design rateAssumptions listed

Every rate claim carries SKU, order and peak-window assumptions in the project record.

See checklist →
FATTraceable cases

Interface cases reference the responsibility matrix rather than unnamed software demos.

Service path →
SATSite evidence

Acceptance includes installed constraints, live loads and named exception scripts.

SAT path →
ServiceHandover pack

Diagnostics, spares and recovery procedures remain visible after cutover.

Contact →